Interior brickwork is now in place. The facade will be added outside of these.
1346. View of the rear of the new school from across 'the meadow', taken from the Humanities Hall, first floor, OLRC. (28/AUG/2014)
1347. Interior brickwork can be seen on the south wing of the building, viewed across the OLRC car park from the thicket. The teaching wing is on the right (29/AUG/2014)
No comments:
Post a Comment