Friday, 13 June 2014

Building Progress (1259 - 1268)



1259. The steel structure of the new school has progressed very quickly this week. This work is along side the teaching wing. Taken on Hamilton Drive, facing south-east. (12/JUN/2014)



1260. View of the new school from the opposite side of Weoley Park Road. (12/JUN/2014)



1261. View of the new school from the opposite side of Weoley Park Road.(12/JUN/2014)



1262. The steel structure of the new school. Taken on Hamilton Drive facing south-east. The teaching wing is on the right. (12/JUN/2014)



1263. View of the new school from the OLRC car park. (12/JUN/2014)



1264. Some of the soil behind the sheet piles is being dug out to make way for a tank which will store water for the school's sprinkler system. Teaching wing on the right. Taken from the OLRC car park. (12/JUN/2014)


1265. View from the Humanities Hall on the first floor of the OLRC, showing the new structure on the left of the meadow. A large area has been surfaced with tarmac. This is to become a play and sports area. (13/JUN/2014)



1266. The work site as it looked from Weoley Park Road this morning. (13/JUN/2014)



1267. The steel structure through the trees of the thicket. Taken on Hamilton Drive this morning. (13/JUN/2014)



1268. View from the Humanities Hall, OLRC, this morning. The structure is longer than yesterday. (13/JUN/2014)


No comments:

Post a Comment